Learn more about these different git repos.
Other Git URLs
As usually (and it should be for the last time), websites need the PNGs for the internal and external release counter. IMHO it is not needed to have 35 days, we always started with the generic Beta banner which was replaced after a week by the final release counter. Therefore 3 weeks should be enough (21 days more or less).
Thank you for providing this.
attachment fedora21-countdown-banner.tar.bz2
@robyduck unpack them control them and close the ticket if they are fine
Login to comment on this ticket.